Pooley Bridge Bridge Repairs

This project at Pooley Bridge was to put in a temporary bridge as the original bridge was washed away in the December 2015 Storm Desmond floods.

The work involved over 200m3 of special lightweight concrete.

handy concrete

Guaranteed quality from your local Readymix Concrete and Liquid Screed company